How to use

Eco-Plaster

1. Prepare & wet the wall

Level before wetting the wall Do hacking for concrete ceilings

1. Prepare & wet the wall

Level before wetting the wall Do hacking for concrete ceilings

2. Add Eco Plaster and sand

HW305 to Sand Ratio(By Volume) External 1:4 Internal 1:4 or 1:5 Ceiling 1:3

2. Add Eco Plaster and sand

HW305 to Sand Ratio(By Volume) External 1:4 Internal 1:4 or 1:5 Ceiling 1:3

3. Add Water and Mix Well

Avoid salty water

3. Add Water and Mix Well

Avoid salty water

4. Finish Plaster

Perform hacking and slurry application for concrete walls and ceilings. Slurry application for other walls.

4. Finish Plaster

Perform hacking and slurry application for concrete walls and ceilings. Slurry application for other walls.

5. No Water Curing Required

Wait 7-10 days before applying putty or paint

5. No Water Curing Required

Wait 7-10 days before applying putty or paint

1. Prepare & wet the wall

Level before wetting the wall Do hacking for concrete ceilings

2. Add Eco Plaster and sand

HW305 to Sand Ratio(By Volume) External 1:4 Internal 1:4 or 1:5 Ceiling 1:3

3. Add Water and Mix Well

Avoid salty water

4. Finish Plaster

Perform hacking and slurry application for concrete walls and ceilings. Slurry application for other walls.

5. No Water Curing Required

Wait 7-10 days before applying putty or paint

5. No Water Curing Required

Wait 7-10 days before applying putty or paint

60

mins

POT LIFE

20

mins

OPEN TIME

50 - 55

sq. ft. / 25 kg

COVERAGE

Average Thickness - 12 mm

Application Video