1. Fill cracks, clean and wet the surface
1. Fill cracks, clean and wet the surface
2. Add components A and B to water.
Ratio by weight: 1 (Liquid) : 2 (Powder) : 0.5 (Water)
2. Add components A and B to water.
Ratio by weight: 1 (Liquid) : 2 (Powder) : 0.5 (Water)
3. Mix using a blender to a homogeneous mix
3. Mix using a blender to a homogeneous mix
4. Apply two coats (One horizontal, one vertical)
After first coat, keep surface dry and traffic free for 3-6 Hrs. Apply second coat.
4. Apply two coats (One horizontal, one vertical)
After first coat, keep surface dry and traffic free for 3-6 Hrs. Apply second coat.
5. Add protective screed/plaster
After three days of air curing of second coat
5. Add protective screed/plaster
After three days of air curing of second coat
1. Fill cracks, clean and wet the surface
2. Add components A and B to water.
Ratio by weight: 1 (Liquid) : 2 (Powder) : 0.5 (Water)
3. Mix using a blender to a homogeneous mix
4. Apply two coats (One horizontal, one vertical)
After first coat, keep surface dry and traffic free for 3-6 Hrs. Apply second coat.
5. Add protective screed/plaster
After three days of air curing of second coat
5. Add protective screed/plaster
After three days of air curing of second coat
45
mins
POT LIFE
90-100%
ELONGATION
10
sq. ft./kg
COVERAGE
2 Coats - 1 mm Total Thickness